GILSON SCHOOL
Formerly HAW CREEK TOWNSHIP HIGH SCHOOL
and GILSON GRADE SCHOOL
BELL TOWER PROJECT--A LEAKY PROBLEM FIXED!
The leak around the bell tower was creating major water damage inside the building and the bell's "feet" had started to drop into the roof creating a very sagging bell.

This projected was headed up by former president, Tim Rickard, who coordinated the removal, repair and eventual re-placement of the tower and bell.

The project started in the fall of 2004 with the tower and bell removed and a temporary cap was placed over the tower hole.
Bell tower before
The bell tower as it looked before the work begins.
Preparing the tower
Hein Construction carpenter, Dave Marshall prepares the tower.
Galesburg Sign & Lighting
Galesburg Sign & Lighting gets the crane ready.
crane moves into position
The crane moves into position.
Workers place straps on tower
Workers place straps on the tower.
Lift off!
Lift off!
flying free
The tower is finally freed.
tower lowered
The tower is slowly lowered to the ground.
It's OK to go
Tim Rickard gives the OK to lift the bell.
bell lifts
The bell begins it's trip to the ground.
repairing leak
Repairing the leak in the roof.
almost touching
Almost touching the ground.
weathered bell
A weathered-looking bell.
aprons lowered
The bell's "aprons" (rocker arms) are lowered.
a weathered tower
The weathered tower before painting.
the tower is finished
Boy Scout, John Garoutte stands next to his completed Eagle Service project. The tower is freshly painted and sports a new roof.
>>>NEXT PAGE - The tower is returned to the roof